Cisco Certified Network Associate (200-301 CCNA) – Question309


Refer to the exhibit. Two new switches are being installed. The remote monitoring team uses the support network to monitor both switches. Which configuration is the next step to establish a Layer 2 connection between the two PCs?

A.
SwitchA(config)#interface GigabitEthernet0/1
SwitchA(config-if)#switchport access vlan 500
SwitchB(config)#interface GigabitEthernet0/1
SwitchB(config-if)#switchport access vlan 500
B. SwitchA(config)#interface GigabitEthernet0/1
SwitchA(config-if)#switchport mode trunk
SwitchB(config)#interface GigabitEthernet0/1
SwitchB(config-if)#switchport mode trunk
C. SwitchA(config)#interface GigabitEthernet0/0
SwitchA(config-if)#switchport trunk allowed vlan 500, 550
SwitchB(config)#interface GigabitEthernet0/0
SwitchB(config-if)#switchport trunk allowed vlan 500, 550
D. SwitchA(config)#interface GigabitEthernet0/0
SwitchA(config-if)#spanning-tree portfast
SwitchA(config-if)#spanning-tree bpduguard enable
SwitchB(config)#interface GigabitEthernet0/0
SwitchB(config-if)#spanning-tree portfast
SwitchB(config-if)#spanning-tree bpduguard enable

Correct Answer: A