To determine if unauthorized changes have been made to production code the BEST audit procedure is to:
A. examine the change control system records and trace them forward to object code files.
B. review access control permissions operating within the production program libraries.
C. examine object code to find instances of changes and trace them back to change control records.
D. review change approved designations established within the change control system.