CRISC Certified in Risk and Information Systems Control – Question619

While evaluating control costs, management discovers that the annual cost exceeds the annual loss expectancy (ALE) of the risk. This indicates the:

A.
control is ineffective and should be strengthened
B. risk is inefficiently controlled
C. risk is efficiently controlled
D. control is weak and should be removed

Correct Answer: B