CRISC Certified in Risk and Information Systems Control – Question694

The risk associated with an asset before controls are applied can be expressed as:

A.
the likelihood of a given threat.
B. the magnitude of an impact.
C. a function of the likelihood and impact.
D. a function of the cost and effectiveness of controls.

Correct Answer: C