CompTIA Network+ N10-008 – Question465

A disaster recovery team needs a solution that would best meet the following requirements:
The server infrastructure has been pre-installed
The fail-over location offers basic life support.
The fail-over location provides basic network connectivity.
Minimizing cost is preferred over quicker business recovery times
The expected time for services to be fully operational is days.
Which of the following sites would meet the requirements?


A.
Cold site
B. Cloud site
C. Warm site
D. Hot site

Correct Answer: A