CompTIA Network+ N10-008 – Question472

A user from a remote office is reporting slow file transfers. Which of the following tools will an engineer MOST
likely use to get detailed measurement data?


A.
Packet capture
B. iPerf
C. SIEM log review
D. Internet speed test

Correct Answer: B

CompTIA Network+ N10-008 – Question470

A network administrator is concerned about a rainbow table being used to help access network resources.
Which of the following must be addressed to reduce the likelihood of a rainbow table being effective?


A.
Password policy
B. Remote access policy
C. Acceptable use policy
D. Data loss prevention policy

Correct Answer: A

CompTIA Network+ N10-008 – Question469

After rebooting an AP, a user is no longer able to connect to the enterprise LAN. A technician plugs a laptop in
to the same network jack and receives the IP 169.254.0.200. Which of the following is MOST likely causing the
issue?


A.
DHCP scope exhaustion
B. Signal attenuation
C. Channel overlap
D. Improper DNS configuration

Correct Answer: A

CompTIA Network+ N10-008 – Question467

A company wants to invest in new hardware for the core network infrastructure. The management team
requires that the infrastructure be capable of being repaired in less than 60 minutes if any major part fails.
Which of the following metrics is MOST likely associated with this requirement?


A.
RPO
B. MTTR
C. FHRP
D. MTBF

Correct Answer: B

CompTIA Network+ N10-008 – Question466

A technician troubleshoots a computer that has intermittent network connectivity and notices the termination
point is loose. The technician also observes that the patch cable has already been replaced.
Which of the following should the technician do NEXT?


A.
Use a tone generator to trace the cable
B. Use a multimeter to determine if PoE is available on the switchport
C. Use a cable crimper to replace the RJ45 connector on the patch cable
D. Use a punchdown tool to reseat the copper in the wall jack

Correct Answer: D

CompTIA Network+ N10-008 – Question465

A disaster recovery team needs a solution that would best meet the following requirements:
The server infrastructure has been pre-installed
The fail-over location offers basic life support.
The fail-over location provides basic network connectivity.
Minimizing cost is preferred over quicker business recovery times
The expected time for services to be fully operational is days.
Which of the following sites would meet the requirements?


A.
Cold site
B. Cloud site
C. Warm site
D. Hot site

Correct Answer: A