CompTIA Network+ N10-008 – Question131

The management team has instituted a 48-hour RTO as part of the disaster recovery plan. Which of the
following procedures would meet the policy's requirements?


A.
Recover all systems to a loss of 48 hours of data.
B. Limit network downtime to a maximum of 48 hours per year.
C. Recover all systems within 48 hours.
D. Require 48 hours of system backup maintenance.

Correct Answer: C

Explanation:

CompTIA Network+ N10-008 – Question128

A voice engineer is troubleshooting a phone issue. When a call is placed, the caller hears echoes of the
receiver's voice. Which of the following are the causes of this issue? (Choose two.)


A.
Jitter
B. Speed mismatch
C. QoS misconfiguration
D. Protocol mismatch
E. CRC errors
F. Encapsulation errors

Correct Answer: AC

CompTIA Network+ N10-008 – Question126

After a firewall replacement, some alarms and metrics related to network availability stopped updating on a
monitoring system relying on SNMP. Which of the following should the network administrator do FIRST?


A.
Modify the device's MIB on the monitoring system.
B. Configure syslog to send events to the monitoring system.
C. Use port mirroring to redirect traffic to the monitoring system.
D. Deploy SMB to transfer data to the monitoring system.

Correct Answer: A