CompTIA Server+ SK0-005 – Question104

SIMULATION
A recent power outage caused email services to go down. A server administrator also received averts from the datacenter's UPS.
After some investigation, the server administrator learned that each PDU was rated at a maximum of 12A.
Instructions
Ensure power redundancy is implemented throughout each rack and UPS alarms are resolved. Ensure the maximum potential PDU consumption does not exceed 80% (or 9.6A).

a.
PDU selections must be changed using the penal icon
b. VM Hosts 1 and 2 and Mall Relay can be moved between racks
c. Certain devices contain additional details.












Correct Answer: See explanation below.

Explanation:

Explanation
1. Mailrelay – Keep the mail relay on the existing Rack1 and change the primary power supply to PDU-B and Failover powersupply as PDU B
2. Move the VM Host 1 and VM Host2 to Rack2.
Assign primary power supply PDU A to VM host1
Assign Failover power supply PDU B to VM host1
Assign primary power supply PDU B to VM host2
Assign Failover power supply PDU A to VM host2