SIMULATION
A recent power outage caused email services to go down. A server administrator also received averts from the datacenter's UPS.
After some investigation, the server administrator learned that each PDU was rated at a maximum of 12A.
Instructions
Ensure power redundancy is implemented throughout each rack and UPS alarms are resolved. Ensure the maximum potential PDU consumption does not exceed 80% (or 9.6A).
a. PDU selections must be changed using the penal icon
b. VM Hosts 1 and 2 and Mall Relay can be moved between racks
c. Certain devices contain additional details.
A recent power outage caused email services to go down. A server administrator also received averts from the datacenter's UPS.
After some investigation, the server administrator learned that each PDU was rated at a maximum of 12A.
Instructions
Ensure power redundancy is implemented throughout each rack and UPS alarms are resolved. Ensure the maximum potential PDU consumption does not exceed 80% (or 9.6A).
a. PDU selections must be changed using the penal icon
b. VM Hosts 1 and 2 and Mall Relay can be moved between racks
c. Certain devices contain additional details.