A data center has experienced an increase in under-voltage events following electrical grid maintenance
outside the facility. These events are leading to occasional losses of system availability. Which of the following
would be the most cost-effective solution for the data center to implement?
A. Uninterruptible power supplies with battery backup
B. Managed power distribution units to track these events
C. A generator to ensure consistent, normalized power delivery
D. Dual power supplies to distribute the load more evenly
outside the facility. These events are leading to occasional losses of system availability. Which of the following
would be the most cost-effective solution for the data center to implement?
A. Uninterruptible power supplies with battery backup
B. Managed power distribution units to track these events
C. A generator to ensure consistent, normalized power delivery
D. Dual power supplies to distribute the load more evenly